Hi,
I am OR analyst specialized in mathematical programming, simulation and optimization.
The complete simulation project actually takes more than a month (around 2-3 months) which includes identifying a system, data collection, analysis, Arena model creation, Input data analysis, output data analysis, multiple simulation runs and results and conclusions.
Also, will you be providing the problem statement and data part?
Contact if interested.
Thanks,
Satish