Find Jobs
Hire Freelancers

CONSTRUCTION PROGRAMME OF WORKS FOR HOUSE RENOVATION/EXTENSION -- 2

$30-250 AUD

Stengt
Lagt ut over 2 år siden

$30-250 AUD

Betalt ved levering
CONSTRUCTION PROGRAMME OF WORKS FOR HOUSE RENOVATION/EXTENSION I NEED SOMEONE TO CREATE A PROGRAMME OF CONSTRUCTIONS WORKS AS PER THE PLAN ATTACHED ONLY EXPERIENCED CONSTRUCTION EXPERTS NEED APPLY
Prosjekt-ID: 31923019

Om prosjektet

8 forslag
Eksternt prosjekt
Aktiv 2 år siden

Ønsker du å tjene penger?

Fordeler med budgivning på Freelancer

Angi budsjettet og tidsrammen
Få betalt for arbeidet ditt
Skisser forslaget ditt
Det er gratis å registrere seg og by på jobber
8 frilansere byr i gjennomsnitt $171 AUD for denne jobben
Brukeravatar
hi there, i am an architect , i have 11 years of experience on house floor plan, foundation plan design with necessary measurement for construction, i have seen your attachment, i am able to do your house floor plan, foundation plan, elevation and 3d exterior design with landscaping very expertly
$50 AUD om 3 dager
4,7 (72 omtaler)
5,2
5,2
Brukeravatar
How ARA YOU? I am PMP-PMI-USA Certified, specialist at project management, expert in Scheduling with Primavera to create schedule and cash flow. I am a civil engineer, construction, class 2004, work as a project manager, PMP Certified, experience in Egypt, Emirates, and Saudi Arabia I Submit High-Quality work, On time. Meg me for Details. My management certificates( PMP, RMP, Primavera, FIDIC Contract, P3O). With my best regards, Eng. Elsayed Elgendy, Civil Engineer, PMP
$140 AUD om 4 dager
4,9 (30 omtaler)
5,0
5,0
Brukeravatar
Hi Sir, I will prepare primavera schedule and provide you with clear Tasks and timeline. I am Planner with18 years of experience. I have worked on several project. You can see an example of one of those projects in my portfolio. If you award me the project I'd be very happy to discuss this further and get started for you as soon as possible. Thanks Mohsin Raza
$190 AUD om 7 dager
0,0 (0 omtaler)
0,0
0,0
Brukeravatar
Highly experienced construction professional with experience in residential buildings in New York City. I can provide you with cost engineering, scheduling, and logistical planning. Please feel free to contact me directly if you need any assistance.
$140 AUD om 4 dager
0,0 (0 omtaler)
0,0
0,0
Brukeravatar
Hi, I am a Masters in construction management graduate, working in the construction industry for 2.5 years as an estimator (MELBOURNE). I work on project programmes and cost analysis on a daily basis. I am unable to open the drawings, and hence would like to confirm the price once I go through them. Thank you.
$175 AUD om 5 dager
0,0 (0 omtaler)
0,0
0,0

Om klienten

AUSTRALIAs flagg
Brisbane, Australia
5,0
19
Betalingsmetode bekreftet
Medlem siden aug. 1, 2021

Klientbekreftelse

Takk! Vi har sendt deg en lenke for at du skal kunne kreve din gratis kreditt.
Noe gikk galt. Vær så snill, prøv på nytt.
Registrerte brukere Publiserte jobber
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Forhåndsvisning innlasting
Tillatelse gitt for geolokalisering.
Påloggingsøkten din er utløpt og du har blitt logget ut. Logg på igjen.