Project needed to be done before 12pm Egyptian time +2GTR -- 2
$10-30 USD
Stengt
Lagt ut over 5 år siden
$10-30 USD
Betalt ved levering
A known construction corporation has been working on a project for renovating
downtown Cairo. The project has been completed, and the main road is now lined
with continuous row of skyscrapers with different heights. Advertisement companies
are all racing to reserve the best places for their billboards. However, the government
does not allow billboards to pass the height of any of the buildings its covering (see
example below). The bigger the billboard, the more profit it will bring back. Given a
row of skyscrapers, their widths and heights, you should determine where we should
place our billboard in order to get the most profit out of it. In other words, our aim is
to maximize the billboard area while abiding by the government rules mentioned
above.
Details:
1. Pseudocode
In this section, add your problem pseudocode.
2. Algorithm paradigm used
In this section, write and explain the algorithm paradigm used and why.
3. Problem Complexity
Show in details, mathematically if possible, algorithm analysis and the complexity computation of the implemented algorithm
4. Implementation
4.1 C++ code
In this section, add your c++ code.
4.2 Screenshot of program actual run
Place a screenshot(s) from your program run.
4. Code Explanation
Draw or show (if possible) and explain in detail how your code found this area.
Problem 2 in the files
Hi Dear Client
I have read the description and I am interested in your project.
I am a professional IOS developer. I can do this task for you. I have good command over Swift, C & complex UI designing. I have built many apps previously.
Sample apps will be provide on request.
Drop a message if you require my services. Looking forward to it.
Thanks, Regards