Market Report 2015 on India's EPCs in the Renewable Energy Market with Focus on Biomass, Waste to Power and Waste to Power plus Recycling
$30-250 USD
Betales ved levering
1. Executive Summary
2. Introduction
3. Power demand outlook
4. Power sector structure
4.1. Generation and capacity
4.2. Grid and system integration
4.3. Analysis of the different states in India
5. Rural electrification
6. Current policy environment for renewable energy
6. 1. Current Regulation
6.2. International Pressures on India to use more Renewable Energy and forecast on possible changes
6.3. Internal Political Pressure on Politicians for Renewable Energy and forecast possible changes. (Also, look at changes in policies from Congress to BJP)
6.4. Regulation on present and future Carbon Emission. Carbon Trading opportunities with installed Renewable Power
7. Tariffs for renewable power across the states of India
8. Market Price for renewable power across the states of India
9. Economic attractiveness of renewable energy
10. Renewable energy deployment under an enhanced case
11. Introduction to the Biomass, Waste to Power and Waste to Power plus Recycling Sector in India
12. Data on installed capacity and power generation
12. 1. Biomass
12.2. Waste to Power
12.3. Waste to Power plus Recycling
13. List of major current and upcoming biomass Plants and the responsible EPC
13. 1. Biomass
13.1.1. Construction and operating costs
13.2. Waste to Power
13.2.1. Construction and operating costs
13.3. Waste to Power plus Recycling
13.3. 1. Construction and operating costs
14. Key EPCs Companies in India
14.0.1 SWOT Analysis for each sector BM, WTP, WTP&R
14.0.2 Technical Ability and Competitive Edge
14.0.3. . EPCs constructing plants with Plasma, Syngas and Heat Transfer Technology
14.0.4. Foreign Technology transfer, contribution or JVs
14. 1. Biomass
14.1.1. Past and present contracts plus, MW and construction costs
14.1.2. Known or projected cost for annual maintenance and operating costs
14.2. Waste to Power
14.2.1. Past and present contracts plus, MW and construction costs
14.2.2. Known or projected cost for annual maintenance and operating costs
14.3. Waste to Power plus Recycling
14.3.1. Past and present contracts plus, MW and construction costs
14.3.2. Known or projected cost for annual maintenance and operating costs
14.4. List of typical problems faced by Renewable Energy Plants in India
14.5 What is the government policies to counteract such problems
14.6. What are the Owners/Promoters of the Renewable Energy Plants doing to mitigate any such risk.
15. Deals in the biomass, waste to power and waste to power plus recycling market for the past year 2014. Deals analysed on the basis
of M&A, Partnership, Asset Financing, Debt Offering, Equity Offering and PE/VC.
16. 0. Why using an EPC for Construction to Handover to Operating Company
16.1. Eliminating Risk, Enhancing Performance
Note: Key companies should be analysed on the ability to avoid risk such as:
[login to view URL] overrun: escalations v/s fixed project cost.
B. Suppliers: integration hurdles.
C. Construction: resource mobilization, sub-contractor experience, productivity.
D. Project management: detailed planning to tertiary levels, leading to unforeseen risks.
E. Quality: poor site fabrication, selection of low cost yet inexperienced vendors.
F. Procurement management: the risk of one time buy v/s experienced buying of equipment.
G. Engineering: risks of re-work, miss-outs, and inadequate man-hours.
H. Scheduling: tracking the project at sub levels, monitoring vendors.
I. Performance: overall plant output v/s individual equipment performance, emissions, reliability, plant availability.
The content of the report must be accurate and well researched using primary as well as secondary sources. ALL sources must be properly denoted at the bottom of a graphic or figure and at the end of the relevant section with the relating footnotes.
Once the payment to the freelancer is complete the ownership of the report passes to EFS Consultants Ltd. and the Freelancer has no longer title over it.
Prosjekt-ID: #6912953
Om prosjektet
20 frilansere byr i gjennomsnitt $228 for denne jobben
Hi there, I am an experienced academic writer with excellent research skills. I can assure you gilt-edged quality and plagiarism free work. I have worked on multiple academic assignments including literature r Mer
I am a professional full time academic research writer fully proficient in HARVARD, APA, MLA, Chicago and Oxford writing styles. I am competent in writing dissertations, thesis, reports, case studies, personal developm Mer
HI, I would like to use my experience to serve you better. You can trust my sincere indulgence both in quality and time frame. If you will give me a chance, I will ensure that you're satisfied. I'm really interested in Mer
I have read all the provided instructions and believe that I am the right person to work on this assignment. I provide excellent quality papers on time. I have 6 years’ experience in academic writing particularly on th Mer
I am able to work on this project and to begin straight off I've the necessities to handle this project effectively and timely too. Looking forward to figure with you. Thanks
Dear Sir/Madam, I am reasonably aware of your project.100% proofreading result. I am sure; I would be your right choice. I am dedicated and passionate about my profession to provide responsible, q Mer
I am a full time freelancer working on daily basis... can produce error free content, I can deliver asap
Snapshot About Me: I am a Financial and Statistical Research Analyst. As a analyst my spectrum of work includes valuation of any financial products (stocks, debt securities etc), corporate project and prepare a report Mer
i specialize in this particular type of work. I look forward to talking with you, learning about what you want and then working diligently to make sure that it is achieved.
Being an EPC energy engineer and having worked on similar assignments before will let me complete this report well Best Regards, Wasim