Revit MEP 2015 Tagging

Avbrutt Lagt ut 5 år siden Betales ved levering
Avbrutt

Tagging devices on floor plans there are ~90 plans each with an average of forty devices per plan(conduits and equipment). Please do not cross leader lines. Have a few of these to doso could be more work incoming if it works well. The tags family and the devices have all required information all that is required is to place the tags and clean up the tag locations. I'd imagine it'd take 8 hours roughly.I I've included a sample sketch for reference. Each conduit should only be tagged once in between boxes even though there may be multiple segments.

3D-modellering AutoCAD Autodesk Revit Bygningarkitektur CAD/CAM

Prosjekt-ID: #17139453

Om prosjektet

2 bud Eksternt prosjekt Aktiv 5 år siden

2 frilansere byr i gjennomsnitt $20/time for denne jobben

amilmef

Hello. I am Amil, Msc Mechanical engineer. I have six years experience with preparing engineering (tech docs) drawings. Also I am certified AutoCAD ( with ad) engineer. Message me and we will discuss more in chat. Mer

$15 CAD / time
(32 Omtaler)
6.2